Then install 24 x 1 1 2 foam between the 2x4 s.
Floor joist over concrete slab.
I believe the irc says 18 min between bottom of joists and floor in crawlspace.
This will give a minimum 1 1 2 inches space between the bottom of the flooring and the concrete slab and about 14 inches between joists.
They call them sleeper joists.
Over them going the direction of the pt on the concrete 16 o c.
Lay another 2x4 plate around the perimeter and like make said again at 4 5 o c.
When i do this i will only have about 7 or 8 inches between the concrete.
The procedure for installing a floor structure over a slab with 2 by 6 joists can be.
Maybe i m using the wrong terminology.
A concrete slab provides a firm stable base for pavers.
Then lay 6 mil poly over it and staple it down.
Going the opposite direction of the pt on the concrete.
It s a fairly simple project and the cost is reasonable 3 to 6 per sq.
Secure each length to the slab with concrete nails spaced approximately 80 cm 32 inches apart and 20 to 30 cm 8 to 12 inches from each end.
Sleepers are long pieces of wood placed on the basement slab that support the subfloor.
1 pound of 1 1 2 inch deck screws.
Hopefully you guys can help me with a project i have in the works or at least on the drawing board if you will.
3 4 subfloor over them.
Install it flat on the slab surface with the outside edge aligned against the side wall or the edge of the floor line.
These will be the end sill plates that support the ends of the floor joists.
Building a framed wood floor over an existing concrete slab can provide the space needed for electric wiring heat venting plumbing drain lines and added insulation when remodeling a basement or garage space.
Ft but expect a weekend or two of hard labor.
Cover the patio with a thin layer of sand lay pavers over it and the results look like a standard paver patio.
Floor joists over concrete slab.
Because some water is seeping into the shed your first.
Been getting a lot of wonderful information around here lately.
Purchase 1 pound of 16d framing nails for every 20 square feet of floor.