Do not install hardwood flooring in bathrooms.
Flooring installed with glue.
And then loosely laying the rest of the planks or tiles.
If the boards are less than 1 inch wide apply glue to the tongue of the installed boards and slide the last row into place using a pry bar and a piece of scrap wood to protect your wall.
Crawl spaces must be a minimum of 24 from the ground to underside of joists.
Slab preparation is critical for glue down and includes sanding scraping leveling and filling low spots because the slab must be flat so the planks can fit correctly.
Boards adhere well to the rough surface of the concrete subfloor and therefore lead to less gaps or planks lifting and buckling.
Engineered flooring can be installed above grade at grade and below grade level.
The glue down method of engineered wood flooring installation is typically the most common and creates a highly stable floor.
Then nail the baseboards and shoe moulding to.
Around the house the rooms with the most traffic such as the front hallway the kitchen and the recreation room are better served by glue down flooring than floating flooring but if you re considering a whole house.
How to install glue down engineered wood flooring on concrete slab preparation.
Once your new floor is complete install transition pieces and remove the spacers.
A glue down floor is usually a better choice in high traffic areas like commercial buildings and industrial spaces because the glue provides extra holding power.
When working on a clean concrete subfloor the glue down method is often the go to choice.